|
The pollution prevention booms that we offer are suitable for the various scenarios of operations to confine pollution due to hydrocarbons at river or maritime sites.
A deployable boom lets you confine accidental pollution. A permanent or semi-permanent boom can be installed as a preventive measure at sensitive locations.
The boom’s float can be inflatable – such will generally be the case with a deployable boom. It can also be made of foam, especially if it is installed as a preventive measure.
The covering fabric – PVC or polyurethane – is chosen for its ability to withstand petrochemicals and polluting agents, and for its ease of cleaning after use.
The boom can be stored on a reel with an internal-combustion engine, or in steel or aluminum containers. We supply both types of system to order.
The pollution prevention system can be complemented by storage tanks– either closed or self-raising, and bydecantation tanks for petrochemical-ridden water.
Our main references :
CEA DAM Moronvilliers; Comex Nucléaire.
.
MOUESCA BRUNO INGENIERIE
2, chemin de la Z.I. de Pollet
01800 Saint Maurice de Gourdans
FRANCE
Tél. : 33 (0) 4 74 61 60 24
Fax : 33 (0) 4 74 61 60 09
Copyright
© Groupe MB Ingénierie 2003 | Credits
|